Managing Risks in a Project Implementation: A Case of Awash Kombolcha Haragebeya Railway Construction Project
Published:
31 December 2018
Vol/Issue:
6(2)
Pages:
51-61
Digital Object Identifier
Full Text
Download Full Text PDF
How to Cite
Mequanint Birhan, Ermias Tesfaye.
(2018). Managing Risks in a Project Implementation: A Case of Awash
Kombolcha Haragebeya Railway Construction Project.
Int. J. of Modern Studies in Mechanical Engineering, 6(2), pp. 51-61. https://doi.org/10.20431/2454-9711.0602005
© 2018 The Author(s).
Published by ARC Publications under
Creative Commons Attribution 4.0 (CC BY 4.0).
Free to share and adapt with attribution.
Related Articles from Int. J. of Modern Studies in Mechanical Engineering
Development of an Integrated Model for Effective Waste Management (A Case Study of The Fed…
Ejiko S. O., Adubi E.G., Akerele O.V.
Vol.9 (1) · pp. 11-24
Solid Works Design and Development of Indigineous Wear Testing Machine
Samuel Omojola EJIKO
Vol.9 (1) · pp. 1-10
Fabrication and Characterization of MR Damper as a Semi-active Device for Vehicle Suspensi…
Ravi Kumar Tadepalli, CSP Rao, K Narayana Rao…
Vol.8 (1) · pp. 1-10
Deployment of Water Level Detection, Indication and Scheduling Using Lab-View
Sailesh K, Shunmathi M
Vol.7 (1) · pp. 1-6
Improving Fault Tolerance of Internal Combustion Gas Engine
for Internal Faults Air-Fuel …
M.Shunmathi, KA.Arirajan
Vol.6 (2) · pp. 39-50
Mechanical Properties of Materials: Definition, Testing and Application
S. Senthil Murugan
Vol.6 (2) · pp. 28-38